Home » Fire Pump Set » no need to bulid the pump house

no need to bulid the pump house

outdoor fire pump set which is no need to build the fire pump house, it can put outdoor directly.

Rated 5/5 based on 381 customer reviews
Share:
Content

Now Most of our package set is for indoor , even the client request the outdoor, we only do some changes on the motor and control panel , now we want to add a cover above the complete pump set , in this way no need to bulid the pump house specially , but the idea is still a prototype, not determined yet. still need to improve. what do you think of this idea?

Inquiry


    More Fire Pump Set

    What kind of terrain to choose what kind of water pump

    This problem, in short, is the selection of water pumps. The following are the applicable way for you to choose water pumps from zjbetter. I hope they can help you choose water pumps and help you better. Choose the water pump that suits your design.
    1. Confirm the use terrain
    First understand the terrain in which the outfit is used, including temperature, moisture, air pressure, air cattiness, dustproof and leakproof conditions, and the position of dangerous areas.
    2. Confirm operating conditions
    Refers to the liquid face pressure( absolute) on the suction side of the liquid, the liquid face pressure on the discharge side, intermittent or nonstop work, fixed or mobile position, and the convenience of installation and conservation.
    3. Confirm the nature of the medium
    Medium temperature, viscosity, density, impregnated vapor pressure, solid flyspeck periphery and content, gas content, cattiness, volatility, trap, toxin.
    4. elect the material of the pump bathe corridor
    According to the physical and chemical parcels of the pumped medium above, the material of the inflow- passing corridor is determined.
    5. Determine performance parameters
    The performance parameters of the water pump can be determined by computation, analogy, test and other styles.
    6. Determine the installation type
    The installation of the channel is determined by the layout of the channel and the installation point, and there are direct connection, perpendicular and other types.
    8. Determine the number of pumps
    In general, spare pumps, especially fire pumps, are set up, and the number of pumps is named according to different situations.